Rothenbaum Stadium
Roofing of the Rothenbaum Stadium in Hamburg with a filigree steel structure of 100 x 100 m support-free
span width. The roof skin consists of a textile membrane. The total area of the roof is approximately 8,500 m²; of this, 3,500 m² can be opened or closed within five minutes.
Architects: ASP Schweger, Hamburg
Planning time: 1993 - 1997
execution time: 1997 - 1999
Service phases taken over: LPH 1 - 8 according to § 64 HOAI (structural design for the roof construction)
Client: Deutscher Tennisbund Rothenbaum Turnier GmbH, Ham
Dipl.-Ing. Roland Bechmann Geschäftsführer / General Manager Werner Sobek Stuttgart GmbH Albstr. 14 70597 Stuttgart Germany Tel +49.711.76750-64 Fax +49.711.76750-44 roland.bechmann@wernersobek.com www.wernersobek.com